SYNER company needs an electricity to carry on the construction works on Areál ledových sportů.. The first visible result of activities on the primary school Ke Kateřinkám land is a transformer station. It will not only provide an electric current for the construction period, it will be the energy heart of the entire ALS operation in the future. Since we care about not harming the environment and especially the trees, for which the construction industry is certainly a complication, we have commissioned a professional company to ensure the best protection of the existing vegetation so as not to damage the trees. The result is a comfortable casing that protects the trees. The entire building activity is planned not to disturb classroom teaching, and school children can safely use the outdoor sports facilities that AR delta has refurbished, completed and handed over to school more than one year ago.